Here are some pictures taken over the last week or so to update you visually of what’s happening here on Denman Island.
This is also posted on my Facebook page
- Building the lower panel of the door with Douglas Fir
- … sanding …
- The back door basically assembled
- Stiles have been added and more sanding
- after sanding comes the toning … then more sanding
- Installing the door
- one person works as the rest watch 😉
- the handle is installed and the back wall has been panelled
- panelling the side wall
- The workshop as it looked as of yesterday afternoon
Leave a Reply